“The conventional wor ” 中國GB標準檢索結果 |
![]() |
1. 已翻譯的GB標準英文版(有 SALE
標誌的),以及GB標準中文版,可以直接在網站上購買,在收到您付款後,會在1~3天內發您郵箱。 2. 其他未翻譯的GB標準英文版,在接到您翻譯訂單後,才進行翻譯,時間一般需要多3~5天。 |
![]() |
SY/T 5587.9-1993 油水井常規修井作業 換井口裝置作業規程(中英文版) (Conventional oil wells, workover operations. In other wellhead equipment operating procedures) |
![]() |
|
![]() |
SY/T 5587.6-1993 油水井常規修井作業 起下油管作業規程(中英文版) (Conventional oil wells, workover operations. Since the tubing under operating procedures) |
![]() |
|
![]() |
SY/T 5587.3-2004 常規修井作業規程 第3部分:油氣井壓井、替噴、誘噴(中英文版) The conventional workover procedures - Part 3: oil and gas wells kill behalf spray induced flow |
![]() |
|
![]() |
SY/T 5587.14-1993 油水井常規修井作業 注水泥塞作業規程(中英文版) (Conventional oil wells, workover operations. Note the cement plug operating procedures) |
![]() |
找到:4條目 | [首頁]-[上一頁]-[下一頁]-[尾頁] | 去到: 1 |