“Commissioning guidel ” 中國GB標準檢索結果 |
![]() |
1. 已翻譯的GB標準英文版(有 SALE
標誌的),以及GB標準中文版,可以直接在網站上購買,在收到您付款後,會在1~3天內發您郵箱。 2. 其他未翻譯的GB標準英文版,在接到您翻譯訂單後,才進行翻譯,時間一般需要多3~5天。 |
![]() |
NB/T 20467-2017 壓水堆核電廠反應堆保護系統調試技術導則(中英文版) (Technical Guidelines for Commissioning of Reactor Protection System in PWR Nuclear Power Plant) |
![]() |
|
![]() |
NB/T 20423-2017 核電廠移動式應急柴油發電機組調試技術導則(中英文版) (Technical Guidelines for Commissioning of Mobile Emergency Diesel Generating Sets in Nuclear Power Plants) |
![]() |
|
![]() |
NB/T 25048-2016 核電廠汽輪機模擬調試技術導則(中英文版) Commissioning technical guidelines for turbine simulation of nuclear power plant |
![]() |
|
![]() |
NB/T 25026-2014 核電廠線上化學儀錶調試導則(中英文版) Guideline for the commissioning of on-line chemical monitoring instrument in nuclear power plant |
![]() |
|
![]() |
NB/T 25015-2013 核電廠汽輪發電機組調試技術導則(中英文版) Guideline for Turbine-Generator commissioning of nuclear power plant |
![]() |
|
![]() |
NB/T 25012-2013 核電廠汽水分離再熱器系統調試導則(中英文版) Commissioning guidelines for moisture separator reheater system of nuclear power plant |
![]() |
|
![]() |
NB/T 25011-2013 核電廠水化學處理系統調試導則(中英文版) Commissioning guideline for water chemical treatment system of nuclear power plant |
![]() |
|
![]() |
NB/T 20161-2012 壓水堆核電廠堆外中子注量率測量系統安裝與試驗技術規程(中英文版) Installation and commissioning technical guideline for ex-core neutron flux measuring system for pressurized water reactor of nuclear power plants |
![]() |
|
![]() |
DL/T 863-2016 汽輪機啟動調試導則(中英文版) (Guideline for commissioning of steam turbine) |
![]() |
|
![]() |
DL/T 852-2016 鍋爐啟動調試導則(中英文版) (Guidelines for commissioning of boilers) |
![]() |
|
![]() |
DL/T 1076-2007 火力發電廠化學調試導則(中英文版) Guideline for the commissioning of chemistry system in power plants |
![]() |
|
![]() |
GB/T 28551-2012 核電廠離心泵組調試技術導則(中英文版) Technical guideline of centrifugal pump set commissioning for nuclear power plant |
![]() |
|
![]() |
GB/T 25739-2010 核電廠閥門調試技術導則(中英文版) Technical guideline of valves commissioning for nuclear power plant |
![]() |
|
![]() |
GB/T 25738-2010 核電廠電動機調試技術導則(中英文版) Technical guideline of motor commissioning for nuclear power plant |
![]() |
找到:14條目 | [首頁]-[上一頁]-[下一頁]-[尾頁] | 去到: 1 |