网站首頁   GB 中國國家標準檢索   GB標準關鍵詞 特價英文版GB標準   GB標準檢測及合規性分析 價格和支付方式 聯系我們
 

“Nuclear power plant ” 中國GB標準檢索結果

1. 已翻譯的GB標準英文版(有 SALE 標誌的),以及GB標準中文版,可以直接在網站上購買,在收到您付款後,會在1~3天內發您郵箱。
2. 其他未翻譯的GB標準英文版,在接到您翻譯訂單後,才進行翻譯,時間一般需要多3~5天。
       
GB/T 44080-2024
(中英文版)
Reliability, availability, maintainability and safety management specifications for nuclear power plants
GB/T 43797-2024
(中英文版)
General requirements for renewal assessment of nuclear power plant operating license
GB/T 43532-2023
(中英文版)
Nuclear power plant instrumentation and control system network security prevention and control
GB/T 13631-2023
(中英文版)
Design criteria for auxiliary control rooms in nuclear power plants
GB/T 13629-2023
(中英文版)
Applicable guidelines for programmable digital devices in nuclear power plant safety systems
GB/T 43347-2023
(中英文版)
Monitoring of environmental parameters of electrical, instrumentation and control equipment important for nuclear power plant safety
GB/T 43107-2023
(中英文版)
Stainless steel seamless steel pipe for instrument pressure induction in nuclear power plants
GB/T 12727-2023
(中英文版)
Appraisal of electrical equipment important to safety in nuclear power plants
GB/T 42545-2023
(中英文版)
General requirements for the whole life cycle of corrosion control of rubber lining engineering in nuclear power plants
GB/T 41754-2023
(中英文版)
Duplex stainless steel plate for nuclear power plant
GB/T 41591-2022
(中英文版)
First Criticality Test of PWR Nuclear Power Plant Reactor
GB/T 41585-2022
(中英文版)
Specifications for writing commissioning program of pressurized water reactor nuclear power plant
GB/T 41586-2022
(中英文版)
Basic input parameters and output results of nuclear power plant emergency assessment
GB/T 41576-2022
(中英文版)
Requirements for unit performance test after fuel loading in pressurized water reactor nuclear power plant
GB/T 41581-2022
(中英文版)
Estimation of Emergency Evacuation Time of Nuclear Power Plant
GB/T 41582-2022
(中英文版)
Rapid Estimation Method of Accident Source Term in Nuclear Power Plant
GB/T 41584-2022
(中英文版)
Requirements for thermal state performance test before fuel loading in pressurized water reactor nuclear power plant
GB/T 41587-2022
(中英文版)
Requirements for cold-state performance test before fuel loading in pressurized water reactor nuclear power plant
GB/T 41583-2022
(中英文版)
Nuclear power plant core damage assessment method
GB/T 41157.5-2022
(中英文版)
Fasteners for nuclear power plants—Part 5:Acceptance inspection
GB/T 41157.1-2022
(中英文版)
Fasteners for nuclear power plants—Part 1:Bolts, screws and studs made of alloy steel
GB/T 41157.2-2022
(中英文版)
Fasteners for nuclear power plants—Part 2:Nuts made of carbon steel and alloy steel
GB/T 41157.3-2022
(中英文版)
Fasteners for nuclear power plants—Part 3:Bolts, screws and studs made of corrosion-resistant stainless steel
GB/T 41157.4-2022
(中英文版)
Fasteners for nuclear power plants—Part 4:Nuts made of corrosion-resistant stainless steel
GB/T 41241-2022
(中英文版)
Nuclear power plant industrial control system network security management requirements
GB/T 9225-2022
(中英文版)
Application Guide for Reliability Analysis of Nuclear Power Plant Systems and Other Nuclear Facilities
GB/T 42292-2022
(中英文版)
Occupational Exposure Dose Evaluation of Pressurized Water Reactor Nuclear Power Plant
GB/T 42290-2022
(中英文版)
Code for analysis and control of airborne radioactive source items in pressurized water reactor nuclear power plants
GB/T 42141-2022
(中英文版)
Design criteria for radiation protection of nuclear island buildings under accident conditions in pressurized water reactor nuclear power plants
GB/T 42291-2022
(中英文版)
Design criteria for radiation protection of doors and windows in the control area of pressurized water reactor nuclear power plants

找到:147條目   |  [首頁]-[上一頁]-[下一頁]-[尾頁]  | 去到: 1 2 3 4 5

 

1F Zhongmao Building, No.1 Beizhan Road, Luohu District, Shenzhen City, China
+86-755-2583-1330        [email protected] 
©  Copyright 2001-2025  RJS MedTech Inc. All Rights Reserved