Home   GB Standards Search   GB Standards Index GB Standards Testing   GB Standards Compliance Pricing & Payment Contact Us
 

China Electric power autom GB Standards Search Result

1. Ready translated GB standards and Chinese version GB Standards, you can purchase directly in the web page; After receive your payment, we will send the GB Standards PDF file to your Email within 1~3 days.
2. Other English version GB Standards are not ready translated, only after get your order, then we translate them, time usually need 3-5 days .
       
GB/Z 42151.77-2024
Electric power automation communication networks and systems - Part 7-7: IEC-61850 related data model machine-processable format for tools
- 英文版
GB/T 42151.4-2024
Electric power automation communication networks and systems-Part 4: System and project management
- 英文版
GB/T 40592-2021
Technical rules for automatic over-frequency generator tripping in electric power system
- 英文版
GB/T 40588-2021
Technical provisions for automatic under-voltage load shedding in electric power systems
- 英文版
GB/T 40596-2021
Technical rules for automatic under-frequency load shedding in electric power systems
- 英文版
GB/T 50479-2011
Technical code of cabinet(panel) for protection and automation equipments of electric power system
- 英文版
GB/T 50062-2008
Code for design of relaying protection and automatic device of electric power installation
- 英文版
GB/T 12786-2006
Automatic electric power plant with internal combustion engines for general specification
- 英文版

Find out:8Items   |  To Page of: First -Previous-Next -Last  | 1

 

1F Zhongmao Building, No.1 Beizhan Road, Luohu District, Shenzhen City, China
+86-755-2583-1330        [email protected] 
©  Copyright 2001-2025  RJS MedTech Inc. All Rights Reserved