China Iron ore for blast f GB Standards Search Result |
1. Ready translated GB standards and Chinese version GB Standards, you can purchase directly in the web page; After receive your payment, we will send the GB Standards PDF file to your Email within
1~3 days.
2. Other English version GB Standards are not ready translated, only after get your order, then we translate them, time usually need 3-5 days . |
GB/T 24189-2024 Iron ore for blast furnaces - Determination of reducibility expressed as the final reduction index - 英文版 |
|||
GB/T 10322.6-2022 Determination of hot cracking index of Iron ore for blast furnace charge - 英文版 |
|||
GB/T 13240-2018 Iron ore pellets for blast furnace feedstocks—Determination of the free-swelling index - 英文版 |
|||
GB/T 14201-2018 Iron ore pellets for blast furnace and direct reduction feedstocks—Determination of the crushing strength - 英文版 |
|||
GB/T 34568-2017 Iron ores for blast furnace and direct reduction feedstocks-Determination of bulk density - 英文版 |
|||
GB/T 18838.2-2017 Preparation of steel substrates before application of paints and related products—Specifications for metallic blast-cleaning abrasives—Part 2: Chilled-iron grit - 英文版 |
|||
GB/T 31923.2-2015 Iron ores for blast furnace feedstocks—Determinaction of low-temperature reduction-disintegration indices by static method—Part 2: Reduction with CO and N2 - 英文版 |
|||
GB/T 31923.1-2015 Iron ores for blast furnace feedstocks—Determination of low-temperature reduction-disintegration indices by static method—Part 1: Reduction with CO、CO2、H2 and N2 - 英文版 |
|||
GB/T 17850.6-2011 Preparation of steel substrates before application of paints and related products - Specifications for non-metallic blast-cleaning abrasives - Part 6: Iron furnace slag - 英文版 |
|||
GB/T 24531-2009 Iron ores for blast furnace and direct reduction feedstocks - Determination of the tumble and abrasion indices - 英文版 |
|||
GB/T 24530-2009 Iron ores for blast furnace feedstocks - Determination of reduction under load - 英文版 |
|||
GB/T 24515-2009 Iron ores for blast furnace feedstocks - Determination of the reducibility by the rate of reduction index - 英文版 |
|||
GB/T 24204-2009 Iron ores for blast furnace feedstocks - Determination of low-temperature reduction-disintegration indices by dynamic method - 英文版 |
|||
GB/T 24189-2009 Iron ores for blast furnace feedstocks - Determination of the reducibility by the final degree of reduction index - 英文版 |
Find out:14Items | To Page of: First -Previous-Next -Last | 1 |