China Direct connection be GB Standards Search Result |
1. Ready translated GB standards and Chinese version GB Standards, you can purchase directly in the web page; After receive your payment, we will send the GB Standards PDF file to your Email within
1~3 days.
2. Other English version GB Standards are not ready translated, only after get your order, then we translate them, time usually need 3-5 days . |
GB/T 22382-2017 Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages of 72.5 kV and above 额定电压72.5 kV 及以上气体绝缘金属封闭开关设备与电力变压器之间的直接连接 - 英文版 |
||
GB/T 22382-2008 Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltage of 72.5 kV and above 额定电压 72.5kV 及以上气体绝缘金属封闭开关设备与电力变压器之间的直接连接 - 英文版 |
||
GB/T 13133-2008 Information technology - Telecommunication and information exchange between systems - DTE to DTE direct connections 信息技术 系统间远程通信和信息交换 DTE到DTE直接连接 - 英文版 |
Find out:3Items | To Page of: First -Previous-Next -Last | 1 |