China Overhead travelling GB Standards Search Result |
1. Ready translated GB standards and Chinese version GB Standards, you can purchase directly in the web page; After receive your payment, we will send the GB Standards PDF file to your Email within
1~3 days.
2. Other English version GB Standards are not ready translated, only after get your order, then we translate them, time usually need 3-5 days . |
GB/T 20303.5-2021 Cranes—Cabins and control stations—Part 5: Overhead travelling and portal bridge cranes 起重机 司机室和控制站 第5 部分:桥式和门式起重机 - 英文版 |
||
GB/T 22437.5-2021 Cranes—Design principles for loads and load combinations—Part 5:Overhead travelling and portal bridge cranes 起重机 载荷与载荷组合的设计原则 第5部分:桥式和门式起重机 - 英文版 |
||
GB/T 20863.5-2007 Cranes - Classification - Part 5: Overhead travelling and portal bridge cranes 起重机 分级 第5部分: 桥式和门式起重机 - 英文版 |
||
GB/T 20303.5-2006 Cranes - Cabins - Part 5: Overhead travelling and portal bridge cranes 起重机 司机室 第5部分:桥式和门式起重机 - 英文版 |
||
GB/T 18874.5-2002 Cranes--Information to be provided--Part 5:Overhead travelling cranes and portal bridge cranes 起重机 供需双方应提供的资料 第5部分:桥式和门式起重机 - 英文版 |
||
GB/T 790-1995 Overhead travelling crane--Span series and lifting height series 电动桥式起重机跨度和起升高度系列 - 英文版 |
||
GB/T 6974.12-1986 Lifting appliances--Vocabulary--Overhead travelling cranes 起重机械名词术语 桥式起重机 - 英文版 |
Find out:7Items | To Page of: First -Previous-Next -Last | 1 |